The contractor wants to repair a defect, but you disagree about the time required. You want to live normally again; the contractor mentions drying time, materials or another specialist. A useful repair period must fit the specific assignment and make clear what is expected when. This page helps private clients under Dutch law prepare the programme and its justification. In a stalled dispute, a construction lawyer can assess the legal purpose of the deadline and your letter. The formal structure of a notice of default requires separate assessment as well.
Sources (3)
On this page
1. Define the expected repair first
Explain for each defect which complaint must be resolved. Painting over a damp patch is a different task from identifying the leak first and then restoring the finish. Record which cause is known and which remains under investigation. Without that distinction, the parties may accept the same end date while expecting different work.
Request a proposal setting out the necessary operations and a subsequent check. Attach relevant photographs and any existing report. Where the method is technically uncertain, ask an expert whether it can actually solve the problem. A deadline becomes useful only when its scope and how completion can be verified are clear.
2. Show technical dependencies
Ask which materials, people and preparatory steps are required. Must an investigation happen first, a component be ordered or a structure dry out? Record what is known and what still needs confirmation. A general statement that the contractor is busy gives less clarity than the genuinely necessary sequence of work.
ACM ConsuWijzer explains that reasonableness depends on circumstances, using exterior painting during persistent rain as an example of work that may be impossible. Do not treat this as standard postponement for every building defect. Examine which circumstance affects this repair and why. If necessary, obtain an independent technical explanation of a lengthy programme.
3. Describe use and urgency
Describe the consequences: an unusable bathroom, increasing moisture damage or a component that remains safe to use. Give this information to the contractor and adviser. Waiting for a cosmetic correction differs practically from a home that is barely habitable. Have a suitable expert assess safety questions.
Discuss whether temporary protection is necessary and possible while permanent repair is prepared. Record what it achieves and what remains outstanding. Emergency provision need not have the same quality or lifespan as the final solution. Ask the lawyer how to record it without later disagreement over whether the complaint had already been settled in full.
4. Specify access and cooperation
Agree which days the contractor has access and which rooms must be available. Identify who attends and how appointments are confirmed. Must furniture be moved, another contractor attend or information be supplied? Record those duties. Repair becomes difficult to monitor when there is an end date but the necessary access is not arranged.
Keep messages about cancellations or failures to attend. Record the reason factually and respond. Tell the lawyer about your own unavailability too. An honest overview helps distinguish where delays arose. Calling conduct unwillingness without including the agreements does not clarify the dispute and can make a workable solution harder.
5. Use a clear end and suitable stages
For phased repair, request an overview of investigation, preparation, execution and checking. Specify when feedback will be given about an uncertain element. This makes actual progress trackable. Avoid wording that repeatedly promises only to make contact soon. A progress conversation does not replace the agreement about what must ultimately be resolved.
In a Geschillencommissie Klussenbedrijven decision, different repair tasks received different implementation periods. Connecting a radiator was scheduled differently from other work. This is an example of a tailored decision in a specific file, not a deadline to impose on your contractor without investigation. Ask which programme fits your circumstances technically and legally.
6. Assess non-repair consequences beforehand
Give the lawyer the complete correspondence once an agreed period has expired. Have the agreement, the unfinished part and the appropriate next step assessed. A second practical work appointment is not automatically the repair opportunity legally required. Ask expressly how the programme should align with formal notices.
If you want another contractor, withheld payment or termination, investigate the basis and consequences separately. Preserve the condition and completion costs beforehand. Wanting finally to be finished is understandable but does not itself establish the available legal remedy. Coordinate any guarantee scheme and insurance conditions before definitively commissioning new work.
7. Fictional example: leak with unclear cause
Suppose a consumer sees another damp patch after repair and wants everything solved within days. The contractor says a connection must first be investigated and the wall then allowed to dry, but provides no programme. This example is fictional and does not set a reasonable period for an actual moisture problem.
A useful preparation records investigation, possible cause, temporary protection and final finishing as separate stages. The consumer describes how seriously use is restricted. Advisers can then coordinate the technical work and legal period. Demanding one short date or waiting indefinitely for complete drying does not provide a verifiable repair route.
8. Checklist for agreeing a period
Bring an overview of the defect, method and previous agreements to legal advice. Ask which facts remain missing for assessing the period. Explain your important practical limit and why it matters. Agree who will check the written record and when you will make contact again if an agreed stage does not happen.
- Identify the actual defects and desired repair outcome.
- Provide a technical method or report showing sequence and dependencies.
- Explain your use interests, urgency and any temporary measures.
- Record access, your cooperation and confirmed work appointments.
- List deadlines, feedback points and legal assessment of possible next steps.
Frequently asked questions
Are fourteen days always the right repair period?
No. The appropriate period depends on the work and circumstances. Have its legal purpose assessed as well.
Can the contractor request unlimited postponement for materials?
Ask which materials are needed, what is known about delivery and what other work can proceed meanwhile. Have the specific justification and agreements assessed.
Is temporary protection the same as complete repair?
Record what is resolved temporarily and which permanent work remains. Treat this as a clear agreement with its own follow-up programme.
Can I immediately use another contractor once the programme expires?
First assess the agreements, necessary steps and effects on costs and guarantee. Preserve the existing condition before substantial repair takes place.
Sources
These sources relate to this page. For a specific case, check current rules and your own documents.
- ACM ConsuWijzer — what is reasonable? Accessed: 2026-10-23
- ACM ConsuWijzer — work not performed properly Accessed: 2026-10-23
- Geschillencommissie Klussenbedrijven — reference 117841 Accessed: 2026-10-23
Legal review
Not legally reviewed yetThis version has not been reviewed by a lawyer or legal professional. Checking sources or editing text is not legal approval.
Editorial team Construction law in the Netherlands
We connect explanations to sources and record targeted changes. Legal review is attributed only to the actual reviewed version, with a real reviewer, date and scope. Human legal review of these articles remains open.

Ricardo van der Spoel
Editorial responsibility · Editorial organisation and technology