The contractor says the work is sound while you see leaks, cracks or incorrect execution. A building expert can investigate technical facts, but not every report answers the question your dispute needs. Start with defined instructions and discuss evidence strategy with a construction lawyer for a major conflict. This page concerns private clients under Dutch law. Unsafe use, fast-changing damage or major repairs require timely coordination. A general inspection, your own party report and a court-ordered investigation do not automatically have the same function.
Sources (3)
On this page
1. Identify the first question to answer
For each problem, describe your observations and relevant agreement. A damp patch does not yet prove where water enters. Record visible facts, suspected cause and the contractor’s explanation separately. This helps the expert decide whether visual inspection suffices or other investigation may be needed.
Clarify the purpose too: checking compliance, investigating damage cause or establishing repair options and costs. Ask your lawyer which technical findings the legal next step requires. Do not commission an uncoordinated broad report when one structural element or cause is the core issue.
2. Choose expertise suited to the problem
Ask about experience with the structure and defect type. General building inspection may have limits for structural, installation or particular moisture problems. Discuss inspected parts and excluded questions beforehand. Also record when additional specialist work should be proposed.
Check prior involvement with work or parties. Rechtspraak identifies independence as an issue for experts in proceedings. Discuss potential interests beforehand for a private engagement too. Ask what documents are needed and whether the report clearly separates observation, hypothesis and supported conclusion.
3. Distinguish your own report and judicial investigation
Rechtspraak explains that a party may engage an expert and a court may appoint one. A judicial expert receives instructions and follows the applicable procedure, code and guidance. A report commissioned by you does not become court-ordered merely by being titled “expert report”.
Ask the lawyer which route fits the dispute’s stage. Is an initial private technical exploration useful, or should parties coordinate investigation? Discuss existing reports. A second inspection without a specific additional question may cost money without clarifying the real disagreement. Define the remaining uncertainty beforehand.
4. Agree instructions, visit and costs
Specify object, questions and documents in the engagement. Ask what the quotation includes: site visit, measurements, report, discussion and possible extra work. Rechtspraak says the engaging party pays expert costs. Recovery from someone else needs separate assessment; do not assume automatic full reimbursement.
Discuss access, available drawings and desired attendance. In a dispute, ask the lawyer whether and how the contractor should be invited. Record permission required for opening structures. Inspection without opening has different possibilities from removing material and taking samples.
5. Preserve evidence before conditions change
ACM ConsuWijzer mentions photographs and expert advice for deficient work. Before the visit, record current conditions, dates and recognisable locations. Preserve earlier complaints, drawings and construction photographs. The expert can compare present visibility with what was visible during work.
Discuss combining necessary damage limitation and evidence preservation with the lawyer. For urgency, record why intervention is needed and what disappears. Ask whether removed parts, samples or extra images should be retained. Repair can make technical defects harder to investigate. This does not mean danger must remain; timely technical and legal coordination is precisely required.
6. Read the report for support and limits
Check which documents, accessible parts and measurements the expert identifies. A conclusion is more useful when its basis and remaining uncertainty are visible. Request explanation within the engagement if unclear. Do not read an uninspected part as though its condition were established.
Give the full report and schedules to your lawyer even if findings disappoint. Who legally repairs or pays is not identical to technical observation. For a conflicting opponent’s report, request specific comparison of questions, method and assumptions. Saying your expert is independent does not alone explain why the other conclusion is wrong.
7. Fictional example: recurring leak after roof renovation
Suppose a consumer sees damp after roof renovation. The contractor suspects condensation; an inspector suggests a connection error but could not open it. The consumer wants the entire roof replaced immediately. This fictional example judges neither cause nor liability.
Compare explanations and establish what further investigation can clarify the difference. Instructions may ask what inspection is possible and what must be made accessible. The lawyer assesses coordination within the dispute. A rough new-roof estimate does not itself answer what caused the damage.
8. Checklist for expert and lawyer
First bring a short problem overview, building agreement and current threat. Ask the lawyer to help define the technical question and the expert to estimate practical execution. Agree who contacts the contractor and how unexpected findings are reported.
- Agreement, specification, relevant drawings and changes.
- Observable defects, locations and discovery times.
- Construction photographs, earlier notifications and contractor replies.
- Existing reports, limits of previous inspections and specific remaining questions.
- Investigation quotation, access, urgency and preservation of material or images.
Frequently asked questions
Does a building expert decide legal liability?
Technical investigation and legal assessment have different functions. Have the lawyer compare findings with contract, notifications and other circumstances.
Is my own report a judicial expert report?
No. Rechtspraak distinguishes a party-engaged expert from court appointment with instructions and procedural rules.
Must the contractor always pay my expert?
Do not assume reimbursement. Agree costs in advance and separately assess whether and how far recovery is possible.
Must I postpone repairs until everything is investigated?
Coordinate necessary action and evidence promptly, especially danger or growing damage. Record necessary measures and investigatory data preservable first.
Sources
These sources relate to this page. For a specific case, check current rules and your own documents.
- ACM ConsuWijzer — niet goed uitgevoerd werk Accessed: 2026-10-23
- Rechtspraak — deskundige in een rechtszaak Accessed: 2026-10-23
- Rechtspraak — kosten rechtszaak Accessed: 2026-10-23
Legal review
Not legally reviewed yetThis version has not been reviewed by a lawyer or legal professional. Checking sources or editing text is not legal approval.
Editorial team Construction law in the Netherlands
We connect explanations to sources and record targeted changes. Legal review is attributed only to the actual reviewed version, with a real reviewer, date and scope. Human legal review of these articles remains open.

Ricardo van der Spoel
Editorial responsibility · Editorial organisation and technology